Jump to content

Patrice Merchi

Resident
  • Posts

    5
  • Joined

  • Last visited

Everything posted by Patrice Merchi

  1. Yes I've been keeping an eye on the Vics in those 7 regions for two months since I decided to change from my log home. There's mountains and railroad in some of them which is where you get the log/Vic split. Sadly only about 70 Vics are in that collection. Sigh. I'm keeping an eye on the homes form here too in case they get announced here.
  2. I've been biking/walking those parcels for the past month, and yes about 70 unfortunately. I'm anxious for them to get released as I have a cabin right now and now really want a Victorian, it's been a toss up between that and a Traditional though for a while.
  3. I followed the original instructions and it did work! But only one way. I changed the angles and overlap of the two sculpts and it solved the problem. I kind of suspected that's what I had to do. Thanks for the great instructions everyone!
  4. I am attempting to build a floating bridge that crosses the border from one sim to another I belong to both groups, parcel permissions are the same. The issue is border lag instantly makes the prim/sculpt phantom when you cross the line and you fall. Is this a case of having to make two bridge halves and meeting at the sim edges? (Technically making a floating mountain using a log as the bridge to the next parcel and rock.) Thanks for any ideas.
×
×
  • Create New...